New Sod Plan and Checklist

Dates are check-in windows, not guaranteed readiness. Cold or dormant sod may take much longer. Follow the actual grass, soil, weather and installer plan.

Grass / cultivar: ____________________ Installation date: __________
Area: __________ Caretaker: ____________________
Installer contact: ____________________ Watering instructions: ____________________

Before delivery

Installation day

Days 1–7: moisture and protection

Days 8–14: anchoring checks

Days 15–30 and beyond: transition when ready

Moisture and Care Log

Record checks and changes; do not schedule water from the date alone.

DateRain / wateringInterface moistureRoots / action

Next check: __________ First mowing readiness confirmed: __________
Species maintenance plan started: __________ Notes: ____________________